top of page

3rd sem. Multiporpouse hall

 

During the 3rd semester of my education our group was challenge with a project of a multiporpouse hall, which includes a big gym, a glass hall reception and a wooden administration building with offices and a caffe. The desin of the gym was barely changed from the given, but the rest was completely developed by our group.

 

Here you can see what we ended up with.

Here is the poster showing the idea to have been developed during the semseter

Since we were designing a big public building, it was extremely important to take into consideration fire safety. It was my responsibility to develop it. Everything was done according to current requirements and regulations, which is proved by the documentation.

Technical drawings for the project

Mostly the details and other drawings are made for the Detail 1 phase. Since the semester was mostly concentrated on prefabricated elements, my focus was also mainly on them.

Technical drawings and documentation for the elements production and mounting

During the 3rd semester we designed our own factory, which produces the elements. They were also designed and developed by our group along with the production and installation processes,

 Contact 
Adress
Send a message

Vestergade 75B ST TH

8700 Horsens

Denmark

 

Tel.: +45 50 183 468

+372 51 947 125

Email: razgowk@gmail.com

Your details were sent successfully!

bottom of page